ITAC Assessment: IC0245
ITAC logo
ITAC Assessment: IC0245
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Power Generation Parts
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 150,000
ft2
Annual Production 4,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,014 1,771,419
kWh
Electricity Demand $28,688 3,950
kW-mo/yr
Electricity Fees $24,193 -
Natural Gas $20,243 3,541
MMBtu
TOTAL YEARLY COSTS $173,138
RECOMMENDED SAVINGS* $36,112 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,112

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $575 $517 $422
7,542
kWh
$152
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,465 $4,250 $5,478
97,816
kWh
$987
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $951 $801 $951
16,991
kWh
- -
04 2.8118: Check for accuracy of utility / power meters $4,231 - - - $4,231
05 2.4224: Upgrade controls on compressors $23,890 $13,698 $23,890
426,610
kWh
- -
TOTAL RECOMMENDED $36,112 $19,266 $30,742
548,959
kWh
$1,139
-
kW-mo/yr
$4,231
TOTAL IMPLEMENTED $36,112 $19,266 $30,742
548,959
kWh
$1,139
-
kW-mo/yr
$4,231
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs