Assessment Year | 2021 |
---|---|
Principal Product | Power Generation Parts |
NAICS | 333611: Turbine and Turbine Generator Set Units Manufacturing |
SIC | 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
150,000
ft2
|
Annual Production | 4,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $100,014 | 1,771,419 |
kWh
|
$0.056 |
Electricity Demand | $28,688 | 3,950 |
kW-mo/yr
|
$7.26 |
Electricity Fees | $24,193 | - |
|
- |
Natural Gas | $20,243 | 3,541 |
MMBtu
|
$5.72 |
TOTAL YEARLY COSTS | $173,138 | |||
RECOMMENDED SAVINGS* | $36,112 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,112 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $575 | $517 |
$422
7,542
kWh
|
$152
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,465 | $4,250 |
$5,478
97,816
kWh
|
$987
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $951 | $801 |
$951
16,991
kWh
|
- | - | |
04 | 2.8118: Check for accuracy of utility / power meters | $4,231 | - | - | - | $4,231 | |
05 | 2.4224: Upgrade controls on compressors | $23,890 | $13,698 |
$23,890
426,610
kWh
|
- | - | |
TOTAL RECOMMENDED | $36,112 | $19,266 |
$30,742
548,959
kWh
|
$1,139
-
kW-mo/yr
|
$4,231 | ||
TOTAL IMPLEMENTED | $36,112 | $19,266 |
$30,742
548,959
kWh
|
$1,139
-
kW-mo/yr
|
$4,231 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs