Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

753

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0281 #04 Y:2025 Use solar heat to make electricty $9,217 $118,731
UU0281 #03 Y:2025 Replace boiler $749 $2,450
UU0281 #02 Y:2025 Use demand controller or load shedder $2,120 $2,000
UU0281 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $869 $1,930
UU0280 #04 Y:2025 Optimize plant power factor $4,000 $25,575
UU0280 #03 Y:2025 Eliminate or reduce compressed air usage $5,305 $5,305
UU0280 #02 Y:2025 Install occupancy sensors $8,865 $28,400
UU0279 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,760 $1,400
UU0279 #05 Y:2025 Insulate bare equipment $1,050 $2,860
UU0279 #04 Y:2025 Reduce hot water temperature to the minimum required $8,900 $4,720
UU0279 #03 Y:2025 Repair and eliminate steam leaks $5,400 $15,580
UU0279 #01 Y:2025 Purchase gas directly from a contract gas supplier $92,200 $14,000
UU0276 #06 Y:2025 Utilize daylight whenever possible in lieu of artificial light $339 $990
UU0276 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $8,440 $14,700
UU0276 #02 Y:2025 Utilize controls to operate equipment only when needed $20,500 $110,000
UU0276 #01 Y:2025 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $30,600 $110,000
UU0275 #05 Y:2025 Install occupancy sensors $12,307 $10,880
UU0275 #03 Y:2025 Use automatic flow control $1,516 $5,258
UU0275 #02 Y:2025 Change rate schedules or other changes in utility service $33,900 $8,025
UU0275 #01 Y:2025 Optimize plant power factor $5,030 $15,960