Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

765

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0284 #04 Y:2025 Air condition only space necessary $54,580 $163,800
UU0284 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,230 $17,500
UU0284 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $900 $1,050
UU0290 #05 Y:2025 Install vinyl strip / high speed / air curtain doors $1,346 $3,890
UU0290 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $701 $5,300
UU0290 #01 Y:2025 Install occupancy sensors $760 $2,640
UU0289 #05 Y:2025 Ventilation system to shut off when room is not in use $2,544 $2,000
UU0289 #04 Y:2025 Install occupancy sensors $419 $1,650
UU0289 #03 Y:2025 Use solar heat to make electricty $24,834 $226,730
UU0289 #02 Y:2025 Use radiant heater for spot heating $1,570 $9,150
UU0289 #01 Y:2025 Use battery storage for demand control $9,476 $40,110
UU0283 #02 Y:2025 Adjust burners for efficient operation $4,300 $3,800
UU0281 #04 Y:2025 Use solar heat to make electricty $9,217 $118,731
UU0281 #03 Y:2025 Replace boiler $749 $2,450
UU0281 #02 Y:2025 Use demand controller or load shedder $2,120 $2,000
UU0281 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $869 $1,930
UU0280 #04 Y:2025 Optimize plant power factor $4,000 $25,575
UU0280 #03 Y:2025 Eliminate or reduce compressed air usage $5,305 $5,305
UU0280 #02 Y:2025 Install occupancy sensors $8,865 $28,400
UU0279 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,760 $1,400