| UU0281 #04 Y:2025 | 04 | 2025 | Use solar heat to make electricty | $9,217 | $118,731 | |
| UU0281 #03 Y:2025 | 03 | 2025 | Replace boiler | $749 | $2,450 | |
| UU0281 #02 Y:2025 | 02 | 2025 | Use demand controller or load shedder | $2,120 | $2,000 | |
| UU0281 #01 Y:2025 | 01 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $869 | $1,930 | |
| UU0280 #04 Y:2025 | 04 | 2025 | Optimize plant power factor | $4,000 | $25,575 | |
| UU0280 #03 Y:2025 | 03 | 2025 | Eliminate or reduce compressed air usage | $5,305 | $5,305 | |
| UU0280 #02 Y:2025 | 02 | 2025 | Install occupancy sensors | $8,865 | $28,400 | |
| UU0279 #06 Y:2025 | 06 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,760 | $1,400 | |
| UU0279 #05 Y:2025 | 05 | 2025 | Insulate bare equipment | $1,050 | $2,860 | |
| UU0279 #04 Y:2025 | 04 | 2025 | Reduce hot water temperature to the minimum required | $8,900 | $4,720 | |
| UU0279 #03 Y:2025 | 03 | 2025 | Repair and eliminate steam leaks | $5,400 | $15,580 | |
| UU0279 #01 Y:2025 | 01 | 2025 | Purchase gas directly from a contract gas supplier | $92,200 | $14,000 | |
| UU0276 #06 Y:2025 | 06 | 2025 | Utilize daylight whenever possible in lieu of artificial light | $339 | $990 | |
| UU0276 #05 Y:2025 | 05 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $8,440 | $14,700 | |
| UU0276 #02 Y:2025 | 02 | 2025 | Utilize controls to operate equipment only when needed | $20,500 | $110,000 | |
| UU0276 #01 Y:2025 | 01 | 2025 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $30,600 | $110,000 | |
| UU0275 #05 Y:2025 | 05 | 2025 | Install occupancy sensors | $12,307 | $10,880 | |
| UU0275 #03 Y:2025 | 03 | 2025 | Use automatic flow control | $1,516 | $5,258 | |
| UU0275 #02 Y:2025 | 02 | 2025 | Change rate schedules or other changes in utility service | $33,900 | $8,025 | |
| UU0275 #01 Y:2025 | 01 | 2025 | Optimize plant power factor | $5,030 | $15,960 |