714
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UU0266 #06 Y:2025 | 06 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $633 | $543 | |
| UU0266 #05 Y:2025 | 05 | 2025 | Eliminate or reduce compressed air usage | $5,730 | $6,960 | |
| UU0266 #04 Y:2025 | 04 | 2025 | Use / purchase optimum sized compressor | $15,500 | $38,200 | |
| UU0266 #02 Y:2025 | 02 | 2025 | Use radiant heater for spot heating | $8,217 | $13,000 | |
| UU0266 #01 Y:2025 | 01 | 2025 | Replace existing hvac unit with high efficiency model | $15,681 | $22,500 | |
| UU0265 #09 Y:2024 | 09 | 2024 | Utilize higher efficiency lamps and/or ballasts | $119 | $551 | |
| UU0265 #08 Y:2024 | 08 | 2024 | Recover waste heat from equipment | $545 | $572 | |
| UU0265 #05 Y:2024 | 05 | 2024 | Replace hydraulic / pneumatic equipment with electric equipment | $1,338 | $5,515 | |
| UU0265 #04 Y:2024 | 04 | 2024 | Use battery storage for demand control | $1,620 | $14,000 | |
| UU0265 #02 Y:2024 | 02 | 2024 | Improve air circulation with destratification fans / other methods | $2,450 | $9,720 | |
| UU0265 #01 Y:2024 | 01 | 2024 | Ventilation system to shut off when room is not in use | $10,697 | $45,926 | |
| UU0263 #12 Y:2024 | 12 | 2024 | Replace fossil fuel equipment with electrical equipment | $32,910 | $158,576 | |
| UU0263 #11 Y:2024 | 11 | 2024 | Apply for tax-free status for energy purchases | $8,090 | $5,000 | |
| UU0263 #10 Y:2024 | 10 | 2024 | Pay utility bills on time | $1,860 | $1,500 | |
| UU0263 #09 Y:2024 | 09 | 2024 | Optimize plant power factor | $3,940 | $9,000 | |
| UU0263 #08 Y:2024 | 08 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $945 | $3,580 | |
| UU0263 #07 Y:2024 | 07 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $5,270 | $7,380 | |
| UU0263 #06 Y:2024 | 06 | 2024 | Purchase gas directly from a contract gas supplier | $4,840 | $11,200 | |
| UU0263 #05 Y:2024 | 05 | 2024 | Repair faulty insulation in furnaces, boilers, etc | $3,948 | $2,110 | |
| UU0263 #04 Y:2024 | 04 | 2024 | Use waste heat from hot flue gases to preheat | $1,805 | $8,150 |