Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

680

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0258 #07 Y:2024 Optimize plant power factor $120,000 $198,000
UU0258 #05 Y:2024 Eliminate or reduce compressed air usage $7,890 $11,500
UU0258 #03 Y:2024 Improve combustion control capability $12,600 $54,500
UU0258 #02 Y:2024 Install / repair insulation on steam lines $25,800 $6,200
UU0259 #06 Y:2024 Install common header on compressors $3,995 $9,200
UU0259 #05 Y:2024 Store heated/ cooled water for use during peak demand periods $53,643 $33,000
UU0259 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $68,165 $110,030
UU0259 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $205,038 $1,865,253
UU0257 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,252 $5,785
UU0257 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $4,182 $19,121
UU0257 #03 Y:2024 Use solar heat to make electricty $26,762 $79,343
UU0257 #02 Y:2024 Increase use of automation $2,630 $12,300
UU0256 #04 Y:2024 Reduce excessive boiler blowdown $5,024 $7,960
UU0256 #01 Y:2024 Use / purchase optimum sized compressor $43,875 $401,481
UU0254 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,182 $5,868
UU0254 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $264 $504
UU0254 #04 Y:2024 Reschedule plant operations or reduce load to avoid peaks $1,472 $2,250
UU0254 #03 Y:2024 Use solar heat to make electricty $509,495 $6,000,000
UU0254 #02 Y:2024 Replace hydraulic / pneumatic equipment with electric equipment $9,712 $81,738
UU0255 #08 Y:2024 Use / purchase optimum sized compressor $6,932 $60,862