Assessment Year | 2024 |
---|---|
Principal Product | Aerospace Engineering and Manufacturing |
NAICS | 336411: Aircraft Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 186 |
Plant Area |
135,000
ft2
|
Annual Production | 840
units
|
Production Hrs. Annual | 4,700
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $62,499 | 1,740,600 |
kWh
|
$0.036 |
Electricity Demand | $89,423 | 5,504 |
kW-mo/yr
|
$16.25 |
Electricity Fees | $30,539 | - |
|
- |
Natural Gas | $46,454 | 3,718 |
MMBtu
|
$12.49 |
TOTAL YEARLY COSTS | $228,915 | |||
RECOMMENDED SAVINGS* | $40,837 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $22,296 | $572,100 |
$17,558
489,000
kWh
|
$4,738
-
kW-mo/yr
|
- | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $2,592 | $37,200 |
$2,417
67,300
kWh
|
$175
-
kW-mo/yr
|
- | |
03 | 4.211: Consider use / purchase of bulk materials where possible | $12,100 | $21,600 | - | - | $12,100 | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,063 | $9,140 |
$952
26,500
kWh
|
$1,111
-
kW-mo/yr
|
- | |
05 | 2.4239: Eliminate or reduce compressed air usage | $1,386 | $8,280 |
$255
7,100
kWh
|
$1,131
-
kW-mo/yr
|
- | |
06 | 2.4322: Use or replace with energy efficient substitutes | $400 | $5,940 |
$205
5,700
kWh
|
$195
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $40,837 | $654,260 |
$21,387
595,600
kWh
|
$7,350
-
kW-mo/yr
|
$12,100 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs