| Assessment Year | 2006 |
|---|---|
| Principal Product | Roofing products |
| NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
| SIC | 2952: Asphalt Felts and Coatings |
| Sales Range | $50 M to 100M |
| # of Employees | 89 |
| Plant Area |
213,000
ft2
|
| Annual Production | 240,000
ton
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $654,177 | 12,095,444 |
kWh
|
$0.054 |
| Natural Gas | $2,191,725 | 195,734 |
MMBtu
|
$11.20 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $781,312 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $607,127 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $436,374 | $470,000 | - |
$436,374
-
MMBtu
|
- | |
| 02 | 2.1132: Repair faulty louvers and dampers | $108,338 | $193,440 | - |
$108,338
-
MMBtu
|
- | |
| 03 | 2.2511: Insulate bare equipment | $88,211 | $4,182 | - |
$88,211
-
MMBtu
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $73,876 | $28,200 |
$73,876
1,365,543
kWh
|
- | - | |
| 05 | 2.2121: Increase amount of condensate returned | $63,098 | $129,785 | - |
$58,699
-
MMBtu
|
$4,399
-
Tgal
|
|
| 06 | 2.7134: Use photocell controls | $6,235 | $990 |
$6,235
115,248
kWh
|
- | - | |
| 07 | 2.7224: Reduce space conditioning during non-working hours | $2,431 | $745 |
$2,431
44,928
kWh
|
- | - | |
| 08 | 2.7135: Install occupancy sensors | $2,145 | $660 |
$2,145
39,645
kWh
|
- | - | |
| 09 | 2.7111: Reduce illumination to minimum necessary levels | $338 | $390 |
$338
6,256
kWh
|
- | - | |
| 10 | 2.7261: Install timers and/or thermostats | $266 | $360 |
$266
4,916
kWh
|
- | - | |
| TOTAL RECOMMENDED | $781,312 | $828,752 |
$85,291
1,576,536
kWh
|
$691,622
-
MMBtu
|
$4,399
-
Tgal
|
||
| TOTAL IMPLEMENTED | $607,127 | $504,117 |
$82,542
1,525,719
kWh
|
$524,585
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs