ITAC Assessment: SD0002
ITAC logo
ITAC Assessment: SD0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PORTABLE HOT TUBS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 370
Plant Area
n/a
Annual Production 20,000
pieces
Production Hrs. Annual 2,040
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,512 2,665,885
kWh
Natural Gas $8,875 1,373
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,290

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $4,725 $3,100 $4,725
52,169
kWh
02 2.2531: Re-size charging openings or add movable cover or door $11,147 $300 $11,147
123,095
kWh
03 2.6232: Install set-back timers $1,086 $5,550 $1,086
12,016
kWh
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $580 $600 $580
6,448
kWh
05 2.7123: Keep lamps and reflectors clean $752 $3,780 $752
8,206
kWh
TOTAL RECOMMENDED $18,290 $13,330 $18,290
201,934
kWh
TOTAL IMPLEMENTED $18,290 $13,330 $18,290
201,934
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs