ITAC Assessment: UU0257
ITAC logo
ITAC Assessment: UU0257
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Potato chips
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 63,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 5,564
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,845 423,120
kWh
Electricity Demand $16,412 1,492
kW-mo/yr
Electricity Fees $5,954 -
Natural Gas $107,077 15,185
MMBtu
Waste Disposal Costs
Water Usage $8,619 2,853
Tgal
TOTAL YEARLY COSTS $168,908
RECOMMENDED SAVINGS* $47,851 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $9,024 $16,577 - - $9,024
-
MMBtu
02 3.2176: Increase use of automation $2,630 $12,300 - - $2,630
-
MMBtu
03 2.9114: Use solar heat to make electricty $26,762 $79,343 $20,191
276,970
kWh
$6,571
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,182 $19,121 $3,593
49,284
kWh
$589
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,252 $5,785 $4,407
60,459
kWh
$845
-
kW-mo/yr
-
TOTAL RECOMMENDED $47,851 $133,126 $28,191
386,713
kWh
$8,005
-
kW-mo/yr
$11,654
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs