Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product BAGELS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 260,000
pieces
Production Hrs. Annual 7,344
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $338,483 6,970,399
kWh
Natural Gas $170,783 47,308
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,357 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,977

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,450 $150 $1,400
-
kWh
- $50
02 2.1233: Analyze flue gas for proper air/fuel ratio $21,055 $400 - $21,055
-
MMBtu
-
03 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $5,340 $10,650 - $5,340
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,584 $30,000 $1,584
32,532
kWh
- -
05 2.4133: Use most efficient type of electric motors $558 $1,740 $558
11,723
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,060 - $1,060
21,688
kWh
- -
07 2.6218: Turn off equipment when not in use $1,380 - - $1,380
-
MMBtu
-
08 2.6231: Utilize controls to operate equipment only when needed $1,150 $1,530 $1,150
23,740
kWh
- -
09 2.7226: Use computer programs to optimize hvac performance $780 $1,000 $780
16,120
kWh
- -
TOTAL RECOMMENDED $34,357 $45,470 $6,532
105,803
kWh
$27,775
-
MMBtu
$50
TOTAL IMPLEMENTED $30,977 $42,790 $3,202
65,943
kWh
$27,775
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs