ITAC Assessment: NC0132
ITAC logo
ITAC Assessment: NC0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product fiber optic cable
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $50
M
to 100
M
# of Employees 215
Plant Area 100,000
ft2
Annual Production 114,854
thousand feet
Production Hrs. Annual 8,600
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $279,323 10,777,550
kWh
Electricity Demand $185,006 17,925
kW-mo/yr
Electricity Fees $14,673 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $149,017 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.4131: Size electric motors for peak operating efficiency $9,465 $14,500 $5,789
206,917
kWh
$3,676
-
kW-mo/yr
- - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,949 $11,150 $6,284
224,502
kWh
$5,453
-
kW-mo/yr
$(-4,788.0)
-
MMBtu
- -
03 2.4239: Eliminate or reduce compressed air usage $2,486 $2,688 $1,520
54,220
kWh
$966
-
kW-mo/yr
- - -
04 2.2511: Insulate bare equipment $2,506 $2,940 $1,300
46,307
kWh
$1,206
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $1,455 $1,600 $1,455
51,876
kWh
- - - -
06 2.7243: Improve air circulation with destratification fans / other methods $440 $1,333 $261
9,379
kWh
$179
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,816 $13,801 $3,557
127,198
kWh
$2,259
-
kW-mo/yr
- - -
08 3.5316: Contract a wood pallet recycling company $900 $200 - - - $900
-
lb
-
09 4.321: Optimize production lot sizes and inventories $119,000 $500 - - - - $119,000
TOTAL RECOMMENDED $149,017 $48,712 $20,166
720,399
kWh
$13,739
-
kW-mo/yr
$(-4,788.0)
-
MMBtu
$900
-
lb
$119,000
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs