| Assessment Year | 1998 |
|---|---|
| Principal Product | fiber optic cable |
| NAICS |
n/a
|
| SIC | 3357: Drawing and Insulating of Nonferrous Wire |
| Sales Range | $50 M to 100M |
| # of Employees | 215 |
| Plant Area |
100,000
ft2
|
| Annual Production | 114,854
thousand feet
|
| Production Hrs. Annual | 8,600
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $279,323 | 10,777,550 |
kWh
|
$0.026 |
| Electricity Demand | $185,006 | 17,925 |
kW-mo/yr
|
$10.32 |
| Electricity Fees | $14,673 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $149,017 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4131: Size electric motors for peak operating efficiency | $9,465 | $14,500 |
$5,789
206,917
kWh
|
$3,676
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $6,949 | $11,150 |
$6,284
224,502
kWh
|
$5,453
-
kW-mo/yr
|
$(-4,788.0)
-
MMBtu
|
- | - | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $2,486 | $2,688 |
$1,520
54,220
kWh
|
$966
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.2511: Insulate bare equipment | $2,506 | $2,940 |
$1,300
46,307
kWh
|
$1,206
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7135: Install occupancy sensors | $1,455 | $1,600 |
$1,455
51,876
kWh
|
- | - | - | - | |
| 06 | 2.7243: Improve air circulation with destratification fans / other methods | $440 | $1,333 |
$261
9,379
kWh
|
$179
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,816 | $13,801 |
$3,557
127,198
kWh
|
$2,259
-
kW-mo/yr
|
- | - | - | |
| 08 | 3.5316: Contract a wood pallet recycling company | $900 | $200 | - | - | - |
$900
-
lb
|
- | |
| 09 | 4.321: Optimize production lot sizes and inventories | $119,000 | $500 | - | - | - | - | $119,000 | |
| TOTAL RECOMMENDED | $149,017 | $48,712 |
$20,166
720,399
kWh
|
$13,739
-
kW-mo/yr
|
$(-4,788.0)
-
MMBtu
|
$900
-
lb
|
$119,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs