ITAC Assessment: CO0513
ITAC logo
ITAC Assessment: CO0513
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Ground mineral products
NAICS
n/a
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 149,000
ft2
Annual Production 120,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Montana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $889,694 17,342,849
kWh
Electricity Demand $54,025 37,308
kW-mo/yr
Electricity Fees $2,328 -
Natural Gas $1,136,554 220,820
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,489 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,420

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $1,879 $3,496 $1,806
36,802
kWh
$73
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $8,450 $2,540 $8,120
165,500
kWh
$330
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $5,980 $1,120 - - $5,980
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,760 $11,070 $5,040
102,700
kWh
$220
-
kW-mo/yr
- $(-1,500.0)
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,420 $600 $3,020
61,400
kWh
$120
-
kW-mo/yr
- $(-720.0)
TOTAL RECOMMENDED $22,489 $18,826 $17,986
366,402
kWh
$743
-
kW-mo/yr
$5,980
-
MMBtu
$(-2,220.0)
TOTAL IMPLEMENTED $2,420 $600 $3,020
61,400
kWh
$120
-
kW-mo/yr
- $(-720.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs