ITAC Assessment: CO0036
ITAC logo
ITAC Assessment: CO0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product AUTO & TRUCK ACCESSORIES
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $5
M
to 10
M
# of Employees 280
Plant Area
n/a
Annual Production 50,000
pieces
Production Hrs. Annual 2,184
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,432 863,716
kWh
Natural Gas $54,233 10,972
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6214: Shut off pilots in standby equipment $179 - - $259
-
MMBtu
$(-80.0)
02 2.4221: Install compressor air intakes in coolest locations $179 $200 $179
2,931
kWh
- -
03 2.5194: Redesign process $593 $200 - $593
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,393 $200 $1,393
21,688
kWh
- -
05 2.7243: Improve air circulation with destratification fans / other methods $1,607 $5,000 $(-493.0)
(-7,620)
kWh
$2,100
-
MMBtu
-
06 2.3191: Use demand controller or load shedder $2,309 $2,400 $2,309
-
kWh
- -
07 2.2443: Re-use or recycle hot or cold process exhaust air $3,744 $10,000 - $3,744
-
MMBtu
-
08 2.7226: Use computer programs to optimize hvac performance $8,457 $1,000 $222
9,965
kWh
$8,235
-
MMBtu
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,330 $2,816 $1,330
17,585
kWh
- -
10 2.7492: Use proper thickness of insulation on building envelope $669 $932 - $669
-
MMBtu
-
11 2.7441: Replace broken windows and/or window sash $6,642 $390 - $6,642
-
MMBtu
-
12 2.7121: Utilize daylight whenever possible in lieu of artificial light $750 $340 $750
11,723
kWh
- -
TOTAL RECOMMENDED $27,852 $23,478 $5,690
56,272
kWh
$22,242
-
MMBtu
$(-80.0)
TOTAL IMPLEMENTED $17,933 $2,722 $1,615
31,653
kWh
$16,398
-
MMBtu
$(-80.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs