Assessment Year | 2003 |
---|---|
Principal Product | rocket motor casings |
NAICS | 332313: Plate Work Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
77,000
ft2
|
Annual Production | 100
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $49,221 | 2,313,137 |
kWh
|
$0.021 |
Electricity Demand | $23,351 | 3,879 |
kW-mo/yr
|
$6.02 |
Electricity Fees | $4,223 | - |
|
- |
Natural Gas | $79,705 | 28,088 |
MMBtu
|
$2.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,157 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,557 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,212 | $710 |
$7,372
313,700
kWh
|
$2,840
-
kW-mo/yr
|
- | |
02 | 2.4239: Eliminate or reduce compressed air usage | $3,536 | $4,800 |
$2,460
105,400
kWh
|
$1,076
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,044 | $9,000 |
$5,798
248,300
kWh
|
$2,246
-
kW-mo/yr
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $1,693 | - |
$932
39,900
kWh
|
$761
-
kW-mo/yr
|
- | |
05 | 2.1122: Re-size charging openings or add a movable door on equipment | $3,430 | $7,126 | - | - |
$3,430
-
MMBtu
|
|
06 | 2.7135: Install occupancy sensors | $301 | $150 |
$135
5,800
kWh
|
$166
-
kW-mo/yr
|
- | |
07 | 2.4237: Substitute compressed air cooling with water or air cooling | $4,941 | $765 |
$819
35,100
kWh
|
$4,122
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $32,157 | $22,551 |
$17,516
748,200
kWh
|
$11,211
-
kW-mo/yr
|
$3,430
-
MMBtu
|
||
TOTAL IMPLEMENTED | $18,557 | $9,860 |
$13,305
567,800
kWh
|
$5,252
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs