ITAC Assessment: UU0047
ITAC logo
ITAC Assessment: UU0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product rocket motor casings
NAICS 332313: Plate Work Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 77,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,221 2,313,137
kWh
Electricity Demand $23,351 3,879
kW-mo/yr
Electricity Fees $4,223 -
Natural Gas $79,705 28,088
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,157 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,557

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,212 $710 $7,372
313,700
kWh
$2,840
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $3,536 $4,800 $2,460
105,400
kWh
$1,076
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,044 $9,000 $5,798
248,300
kWh
$2,246
-
kW-mo/yr
-
04 2.7111: Reduce illumination to minimum necessary levels $1,693 - $932
39,900
kWh
$761
-
kW-mo/yr
-
05 2.1122: Re-size charging openings or add a movable door on equipment $3,430 $7,126 - - $3,430
-
MMBtu
06 2.7135: Install occupancy sensors $301 $150 $135
5,800
kWh
$166
-
kW-mo/yr
-
07 2.4237: Substitute compressed air cooling with water or air cooling $4,941 $765 $819
35,100
kWh
$4,122
-
kW-mo/yr
-
TOTAL RECOMMENDED $32,157 $22,551 $17,516
748,200
kWh
$11,211
-
kW-mo/yr
$3,430
-
MMBtu
TOTAL IMPLEMENTED $18,557 $9,860 $13,305
567,800
kWh
$5,252
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs