ITAC Assessment: MS0285
ITAC logo
ITAC Assessment: MS0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Yeast
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 53
Plant Area 65,000
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $823,054 25,179,750
kWh
Electricity Demand $410,403 42,799
kW-mo/yr
Electricity Fees $43,034 -
Natural Gas $676,073 83,336
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $167,705 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,565

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $147,024 $1,342,000 $446,237
11,758,558
kWh
$189,061
-
kW-mo/yr
$(-81,563.0) $(-406,711.0)
-
MMBtu
02 2.7261: Install timers and/or thermostats $11,445 $575 $8,527
224,679
kWh
- $(-1,104.0) $4,022
-
MMBtu
03 2.6231: Utilize controls to operate equipment only when needed $6,503 $138 $7,471
196,843
kWh
- $(-968.0) -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,062 $151 $2,368
62,394
kWh
- $(-306.0) -
05 2.7132: Install timers on light switches in little used areas $671 $972 $770
20,296
kWh
- $(-99.0) -
TOTAL RECOMMENDED $167,705 $1,343,836 $465,373
12,262,770
kWh
$189,061
-
kW-mo/yr
$(-84,040.0) $(-402,689.0)
-
MMBtu
TOTAL IMPLEMENTED $8,565 $289 $9,839
259,237
kWh
- $(-1,274.0) -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs