ITAC Assessment: UU0256
ITAC logo
ITAC Assessment: UU0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Zirconium and Hafnium
NAICS 331410: Nonferrous Metal (except Aluminum) Smelting and Refining
SIC 3339: Primary Smelting and Refining of Nonferrous Metals, Except Copper and Aluminum
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 25,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 8,476
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $322,223 8,901,187
kWh
Electricity Demand $232,825 14,880
kW-mo/yr
Natural Gas $699,939 144,915
MMBtu
TOTAL YEARLY COSTS $1,254,987
RECOMMENDED SAVINGS* $71,266 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4226: Use / purchase optimum sized compressor $43,875 $401,481 $26,723
738,216
kWh
$17,152
-
kW-mo/yr
- -
02 2.3212: Optimize plant power factor $14,319 $31,625 - - $14,319 -
03 2.1243: Use heat from boiler blowdown to preheat boiler feed water $8,048 $11,730 - - - $8,048
-
MMBtu
04 2.1241: Reduce excessive boiler blowdown $5,024 $7,960 - - - $5,024
-
MMBtu
TOTAL RECOMMENDED $71,266 $452,796 $26,723
738,216
kWh
$17,152
-
kW-mo/yr
$14,319 $13,072
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs