ITAC Assessment: UU0260
ITAC logo
ITAC Assessment: UU0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Lower Limb Prosthetics
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $50
M
to 100
M
# of Employees 70
Plant Area 26,000
ft2
Annual Production 70,000
units
Production Hrs. Annual 2,085
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,515 1,435,118
kWh
Electricity Demand $70,490 5,754
kW-mo/yr
TOTAL YEARLY COSTS $122,005
RECOMMENDED SAVINGS* $46,878 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $27,825 $247,680 $12,667
351,860
kWh
$15,158
-
kW-mo/yr
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $10,585 $5,800 - $10,585
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $4,696 $8,277 $1,387
38,544
kWh
$809
-
kW-mo/yr
$2,500
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,557 $6,277 $896
24,879
kWh
$1,661
-
kW-mo/yr
-
05 2.6212: Turn off equipment during breaks, reduce operating time $726 $3,000 $726
20,176
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $489 $1,818 $165
4,587
kWh
$324
-
kW-mo/yr
-
TOTAL RECOMMENDED $46,878 $272,852 $15,841
440,046
kWh
$28,537
-
kW-mo/yr
$2,500
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs