ITAC Assessment: GT0925
ITAC logo
ITAC Assessment: GT0925
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Metal Coating and Architectural Fabrication
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 53
Plant Area 75,000
ft2
Annual Production 1,227,383
pieces
Production Hrs. Annual 2,860
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,051 641,880
kWh
Electricity Demand $2,332 283
kW-mo/yr
Natural Gas $55,219 12,172
MMBtu
TOTAL YEARLY COSTS $125,602
RECOMMENDED SAVINGS* $29,232 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,966

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1123: Install automatic stack damper $16,903 $6,764 - - $16,903
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,524 $1,100 $1,271
11,987
kWh
$253
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,005 $3,500 $1,952
18,415
kWh
$53
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,266 $9,527 $5,126
48,363
kWh
$139
-
kW-mo/yr
-
05 2.6218: Turn off equipment when not in use $1,177 $2,167 $1,177
11,102
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,358 $8,787 $2,399
22,635
kWh
$(-41.2)
-
kW-mo/yr
-
TOTAL RECOMMENDED $29,232 $31,844 $11,925
112,502
kWh
$404
-
kW-mo/yr
$16,903
-
MMBtu
TOTAL IMPLEMENTED $7,966 $12,793 $7,574
71,452
kWh
$392
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs