Assessment Year | 2014 |
---|---|
Principal Product | Aerospace Core Ceramics |
NAICS | 327110: Pottery, Ceramics, and Plumbing Fixture Manufacturing |
SIC | 3297: Nonclay Refractories |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
40,000
ft2
|
Annual Production | 8,400,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $488,000 | 3,944,000 |
kWh
|
$0.12 |
Natural Gas | $521,000 | 80,900 |
MMBtu
|
$6.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $222,100 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $78,800 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $49,900 | $5,000 |
$49,900
403,000
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,400 | $4,500 |
$7,400
59,500
kWh
|
- | |
03 | 2.1116: Improve combustion control capability | $43,100 | $100 |
$8,700
59,500
kWh
|
$34,400
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,500 | $1,500 |
$6,800
55,000
kWh
|
$14,700
-
MMBtu
|
|
05 | 2.2425: Use flue gases to heat process or service water | $18,400 | $5,000 | - |
$18,400
-
MMBtu
|
|
06 | 2.2531: Re-size charging openings or add movable cover or door | $5,900 | $100 |
$5,900
48,000
kWh
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $19,000 | $10,600 |
$19,000
153,000
kWh
|
- | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $14,500 | $3,000 |
$4,900
39,400
kWh
|
$9,600
-
MMBtu
|
|
09 | 2.2437: Recover waste heat from equipment | $6,400 | $7,500 | - |
$6,400
-
MMBtu
|
|
10 | 2.7241: Install outside air damper / economizer on hvac unit | $36,000 | $126,000 |
$36,000
291,000
kWh
|
- | |
TOTAL RECOMMENDED | $222,100 | $163,300 |
$138,600
1,108,400
kWh
|
$83,500
-
MMBtu
|
||
TOTAL IMPLEMENTED | $78,800 | $11,000 |
$64,100
517,500
kWh
|
$14,700
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs