ITAC Assessment: UU0259
ITAC logo
ITAC Assessment: UU0259
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Frozen food
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 1,300
Plant Area 500,000
ft2
Annual Production 100,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,894,176 69,717,609
kWh
Electricity Demand $1,374,835 122,213
kW-mo/yr
Electricity Fees $361,669 -
Natural Gas $1,765,674 409,352
MMBtu
Waste Disposal Costs
Water Usage $470,073 261,695
Tgal
Water Disposal $136,620 76,962
Tgal
TOTAL YEARLY COSTS $9,003,047
RECOMMENDED SAVINGS* $4,418,831 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $3,866,540 $17,885,484 $6,049,900
86,180,880
kWh
$1,328,010
-
kW-mo/yr
$(-3,511,370.0)
-
MMBtu
-
02 2.9114: Use solar heat to make electricty $221,450 $2,473,450 $215,344
2,974,850
kWh
- - $6,106
-
Tgal
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $205,038 $1,865,253 $102,492
1,460,000
kWh
$102,546
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $68,165 $110,030 $1,166
16,653
kWh
$66,999
-
kW-mo/yr
- -
05 2.3112: Store heated/ cooled water for use during peak demand periods $53,643 $33,000 $(-1,026.9)
14,670
kWh
$54,670
-
kW-mo/yr
- -
06 2.4225: Install common header on compressors $3,995 $9,200 $3,922
56,030
kWh
$73
-
kW-mo/yr
- -
TOTAL RECOMMENDED $4,418,831 $22,376,417 $6,371,796
90,703,083
kWh
$1,552,298
-
kW-mo/yr
$(-3,511,370.0)
-
MMBtu
$6,106
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs