ITAC Assessment: WM0213
ITAC logo
ITAC Assessment: WM0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Cold Formed Steel
NAICS 333517: Machine Tool Manufacturing
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 120,000
ft2
Annual Production 2,000
ton
Production Hrs. Annual 5,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,608 949,375
kWh
Electricity Demand $55,357 3,099
kW-mo/yr
Electricity Fees $15,353 -
Natural Gas $38,276 4,827
MMBtu
TOTAL YEARLY COSTS $175,594
RECOMMENDED SAVINGS* $20,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $10,341 $20,389 - - - $10,341
-
MMBtu
02 2.7231: Use radiant heater for spot heating $3,521 $16,500 - - - $3,521
-
MMBtu
03 2.7135: Install occupancy sensors $2,965 $267 $2,104
30,054
kWh
$861
-
kW-mo/yr
- -
04 2.3132: Recharge batteries on during off-peak demand periods $2,240 $2,590 - - $2,240 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,049 $125 $781
11,162
kWh
$268
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $463 $1,730 $343
4,903
kWh
$120
-
kW-mo/yr
- -
TOTAL RECOMMENDED $20,579 $41,601 $3,228
46,119
kWh
$1,249
-
kW-mo/yr
$2,240 $13,862
-
MMBtu
TOTAL IMPLEMENTED $13,630 $23,104 $781
11,162
kWh
$268
-
kW-mo/yr
$2,240 $10,341
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs