ITAC Assessment: TN0696
ITAC logo
ITAC Assessment: TN0696
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Refrigerator compressors
NAICS
n/a
SIC 3415:
Sales Range $50
M
to 100
M
# of Employees 670
Plant Area 330,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $823,644 35,715,710
kWh
Electricity Demand $416,185 66,761
kW-mo/yr
Natural Gas $505,038 122,668
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $664,573 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $321,273

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 4.611: Begin a practice of predictive / preventative maintenance $184,000 $44,000 - - - - - - - $184,000
02 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $182,800 $173,400 $19,200
833,822
kWh
$18,000
-
kW-mo/yr
- $105,200
-
Tgal
- $40,400
-
Tgal
- -
03 4.421: Modify current incentive program $78,500 $16,450 - - - - - - - $78,500
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $68,153 $6,800 $52,902
2,300,117
kWh
$15,251
-
kW-mo/yr
- - - - - -
05 2.8113: Purchase gas directly from a contract gas supplier $50,500 - - - - - $50,500 - - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $35,400 $18,900 - $35,400
-
kW-mo/yr
- - - - - -
07 2.2521: Isolate steam lines to avoid heating air conditioned areas $31,500 - - - $31,500
-
MMBtu
- - - - -
08 2.4157: Establish a predictive maintenance program $33,720 $5,075 $15,300
663,540
kWh
- - - - - $15,300 $3,120
TOTAL RECOMMENDED $664,573 $264,625 $87,402
3,797,479
kWh
$68,651
-
kW-mo/yr
$31,500
-
MMBtu
$105,200
-
Tgal
$50,500 $40,400
-
Tgal
$15,300 $265,620
TOTAL IMPLEMENTED $321,273 $74,775 $68,202
2,963,657
kWh
$50,651
-
kW-mo/yr
- - - - $15,300 $187,120
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs