Assessment Year | 2024 |
---|---|
Principal Product | Salt, Sulfate of Potash, and Magnesium Chloride |
NAICS | 325180: Other Basic Inorganic Chemical Manufacturing |
SIC | 2812: Alkalies and Chlorine |
Sales Range | $100 M to 500M |
# of Employees | 350 |
Plant Area |
175,000
ft2
|
Annual Production | 325,000
ton
|
Production Hrs. Annual | 8,030
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,268,810 | 76,908,788 |
kWh
|
$0.030 |
Electricity Demand | $2,044,543 | 131,739 |
kW-mo/yr
|
$15.52 |
Electricity Fees | $739,077 | - |
|
- |
Natural Gas | $7,083,780 | 1,636,512 |
MMBtu
|
$4.33 |
TOTAL YEARLY COSTS | $12,136,210 | |||
RECOMMENDED SAVINGS* | $2,196,860 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $158,000 | $725,000 | - | - |
$158,000
-
MMBtu
|
- | |
02 | 2.2136: Install / repair insulation on steam lines | $25,800 | $6,200 | - | - |
$25,800
-
MMBtu
|
- | |
03 | 2.1116: Improve combustion control capability | $12,600 | $54,500 | - | - |
$12,600
-
MMBtu
|
- | |
04 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $1,690,000 | $23,500,000 |
$1,600,000
53,900,000
kWh
|
$1,250,000
-
kW-mo/yr
|
$(-1,080,000.0)
-
MMBtu
|
$(-80,000.0) | |
05 | 2.4239: Eliminate or reduce compressed air usage | $7,890 | $11,500 |
$4,420
150,000
kWh
|
$3,470
-
kW-mo/yr
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,570 | $5,140 |
$1,550
52,700
kWh
|
$1,020
-
kW-mo/yr
|
- | - | |
07 | 2.3212: Optimize plant power factor | $120,000 | $198,000 | - |
$120,000
-
kW-mo/yr
|
- | - | |
08 | 2.8114: Change rate schedules or other changes in utility service | $180,000 | $20,000 | - |
$180,000
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $2,196,860 | $24,520,340 |
$1,605,970
54,102,700
kWh
|
$1,554,490
-
kW-mo/yr
|
$(-883,600.0)
-
MMBtu
|
$(-80,000.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs