ITAC Assessment: UU0258
ITAC logo
ITAC Assessment: UU0258
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Salt, Sulfate of Potash, and Magnesium Chloride
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2812: Alkalies and Chlorine
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 175,000
ft2
Annual Production 325,000
ton
Production Hrs. Annual 8,030
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,268,810 76,908,788
kWh
Electricity Demand $2,044,543 131,739
kW-mo/yr
Electricity Fees $739,077 -
Natural Gas $7,083,780 1,636,512
MMBtu
TOTAL YEARLY COSTS $12,136,210
RECOMMENDED SAVINGS* $2,196,860 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1223: Install smaller boiler (increase high fire duty cycle) $158,000 $725,000 - - $158,000
-
MMBtu
-
02 2.2136: Install / repair insulation on steam lines $25,800 $6,200 - - $25,800
-
MMBtu
-
03 2.1116: Improve combustion control capability $12,600 $54,500 - - $12,600
-
MMBtu
-
04 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $1,690,000 $23,500,000 $1,600,000
53,900,000
kWh
$1,250,000
-
kW-mo/yr
$(-1,080,000.0)
-
MMBtu
$(-80,000.0)
05 2.4239: Eliminate or reduce compressed air usage $7,890 $11,500 $4,420
150,000
kWh
$3,470
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $2,570 $5,140 $1,550
52,700
kWh
$1,020
-
kW-mo/yr
- -
07 2.3212: Optimize plant power factor $120,000 $198,000 - $120,000
-
kW-mo/yr
- -
08 2.8114: Change rate schedules or other changes in utility service $180,000 $20,000 - $180,000
-
kW-mo/yr
- -
TOTAL RECOMMENDED $2,196,860 $24,520,340 $1,605,970
54,102,700
kWh
$1,554,490
-
kW-mo/yr
$(-883,600.0)
-
MMBtu
$(-80,000.0)
TOTAL IMPLEMENTED - - - - - -