ITAC Assessment: UD0289
ITAC logo
ITAC Assessment: UD0289
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product WHEELS & BLOWERS
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $5
M
to 10
M
# of Employees 130
Plant Area
n/a
Annual Production 65,000
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,597 1,665,885
kWh
Natural Gas $117,876 28,720
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,809

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $3,618 $1,000 - $3,618
-
MMBtu
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,453 - $2,453
-
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,150 $4,000 $2,656
39,859
kWh
$(-506.0)
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $791 $1,000 $977
14,654
kWh
$(-186.0)
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $356 $75 $432
5,275
kWh
- $(-76.0)
06 2.7492: Use proper thickness of insulation on building envelope $9,331 $25,000 - $9,331
-
MMBtu
-
07 3.4115: Recover and reuse cooling water $5,791 $20,000 $596
5,275
kWh
- $5,195
TOTAL RECOMMENDED $24,490 $51,075 $7,114
65,063
kWh
$12,257
-
MMBtu
$5,119
TOTAL IMPLEMENTED $2,809 $75 $2,885
5,275
kWh
- $(-76.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs