| Assessment Year | 1998 |
|---|---|
| Principal Product | Truck and van trailers |
| NAICS |
n/a
|
| SIC | 3715: Truck Trailers |
| Sales Range | $10 M to 50M |
| # of Employees | 170 |
| Plant Area |
211,000
ft2
|
| Annual Production | 1,000
pieces
|
| Production Hrs. Annual | 2,898
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $81,041 | 1,043,083 |
kWh
|
$0.078 |
| Electricity Demand | $8,864 | 4,814 |
kW-mo/yr
|
$1.84 |
| Electricity Fees | $1,480 | - |
|
- |
| Natural Gas | $28,811 | 6,441 |
MMBtu
|
$4.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,535 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,425 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $21,130 | $49,220 |
$21,130
228,019
kWh
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,825 | $600 |
$4,825
53,634
kWh
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,630 | $40 |
$2,340
22,860
kWh
|
$290
-
kW-mo/yr
|
- | |
| 04 | 3.5316: Contract a wood pallet recycling company | $1,470 | - | - | - |
$1,470
-
lb
|
|
| 05 | 2.7124: Make a practice of turning off lights when not needed | $920 | $170 |
$800
8,792
kWh
|
$120
-
kW-mo/yr
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $680 | $100 |
$680
7,620
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $560 | $220 |
$400
5,569
kWh
|
$160
-
kW-mo/yr
|
- | |
| 08 | 2.6212: Turn off equipment during breaks, reduce operating time | $320 | - |
$320
3,517
kWh
|
- | - | |
| TOTAL RECOMMENDED | $32,535 | $50,350 |
$30,495
330,011
kWh
|
$570
-
kW-mo/yr
|
$1,470
-
lb
|
||
| TOTAL IMPLEMENTED | $6,425 | $870 |
$6,305
70,046
kWh
|
$120
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs