ITAC Assessment: AM0321
ITAC logo
ITAC Assessment: AM0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Truck and van trailers
NAICS
n/a
SIC 3715: Truck Trailers
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 211,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 2,898
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,041 1,043,083
kWh
Electricity Demand $8,864 4,814
kW-mo/yr
Electricity Fees $1,480 -
Natural Gas $28,811 6,441
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,535 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,425

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $21,130 $49,220 $21,130
228,019
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,825 $600 $4,825
53,634
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,630 $40 $2,340
22,860
kWh
$290
-
kW-mo/yr
-
04 3.5316: Contract a wood pallet recycling company $1,470 - - - $1,470
-
lb
05 2.7124: Make a practice of turning off lights when not needed $920 $170 $800
8,792
kWh
$120
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $680 $100 $680
7,620
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $560 $220 $400
5,569
kWh
$160
-
kW-mo/yr
-
08 2.6212: Turn off equipment during breaks, reduce operating time $320 - $320
3,517
kWh
- -
TOTAL RECOMMENDED $32,535 $50,350 $30,495
330,011
kWh
$570
-
kW-mo/yr
$1,470
-
lb
TOTAL IMPLEMENTED $6,425 $870 $6,305
70,046
kWh
$120
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs