Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

994

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0441 #02 Y:2024 Replace fossil fuel equipment with electrical equipment $47,319 $175,000
LS2506 #06 Y:2024 Consider power loss as well as initial loads and load growth in down-sizing transformers $3,451 $15,964
LS2506 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,396 $9,990
LS2506 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $427 $50
LS2506 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,596 $135
MS0440 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $3,155 -
MS0440 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $10,241 $17,637
MS0439 #05 Y:2024 Replace existing hvac unit with high efficiency model $586 $8,100
MS0439 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $7,650 -
MS0439 #03 Y:2024 Install occupancy sensors $2,676 $7,542
MS0439 #01 Y:2024 Optimize plant power factor $1,314 $1,810
MS0438 #03 Y:2024 Lower temperature during the winter season and vice-versa $105 -
MS0438 #02 Y:2024 Install occupancy sensors $419 $956
TT0325 #10 Y:2024 Meter waste water $1,047 $1,100
TT0325 #09 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $3,955 $1,000
TT0325 #08 Y:2024 Install occupancy sensors $4,068 $15,000
TT0325 #02 Y:2024 Install smaller boiler (increase high fire duty cycle) $68,822 $200,000
MS0443 #02 Y:2024 Install an uninteruptable power supply $51,282 $1,786,854
MS0437 #04 Y:2024 Replace fossil fuel equipment with electrical equipment $288,884 $300,000
MS0436 #01 Y:2024 Install timers on light switches in little used areas $4,420 $255