953
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
MS0417 #03 Y:2023 | 03 | 2023 | Eliminate or reduce compressed air usage | $1,886 | $2,761 | |
TT0293 #09 Y:2023 | 09 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $630 | $2,000 | |
TT0293 #08 Y:2023 | 08 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $736 | $170 | |
TT0293 #07 Y:2023 | 07 | 2023 | Install soft-start to eliminate nuisance trips | $923 | $1,600 | |
TT0293 #06 Y:2023 | 06 | 2023 | Turn off equipment during breaks, reduce operating time | $2,199 | - | |
TT0293 #04 Y:2023 | 04 | 2023 | Eliminate or reduce compressed air usage | $6,615 | $31,320 | |
TT0293 #03 Y:2023 | 03 | 2023 | Upgrade controls on compressors | $7,910 | $600 | |
TT0293 #02 Y:2023 | 02 | 2023 | Replace fossil fuel equipment with electrical equipment | $10,120 | - | |
TT0293 #01 Y:2023 | 01 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $20,707 | $1,500 | |
MS0406 #03 Y:2022 | 03 | 2022 | Turn off equipment when not in use | $5,220 | - | |
MS0403 #05 Y:2022 | 05 | 2022 | Upgrade obsolete equipment | $300 | $3,768 | |
MS0403 #01 Y:2022 | 01 | 2022 | Utilize higher efficiency lamps and/or ballasts | $3,116 | $2,579 | |
UA0259 #05 Y:2022 | 05 | 2022 | Optimize plant power factor | $50,082 | $26,090 | |
UA0259 #01 Y:2022 | 01 | 2022 | Eliminate or reduce compressed air usage | $27,827 | $1,000 | |
MS0398 #01 Y:2022 | 01 | 2022 | Utilize higher efficiency lamps and/or ballasts | $5,227 | $6,769 | |
TT0278 #08 Y:2022 | 08 | 2022 | Substitute compressed air cooling with water or air cooling | $2,362 | $2,736 | |
TT0278 #07 Y:2022 | 07 | 2022 | Replace hydraulic / pneumatic equipment with electric equipment | $3,425 | - | |
TT0278 #04 Y:2022 | 04 | 2022 | Replace existing hvac unit with high efficiency model | $5,912 | $18,000 | |
TT0278 #03 Y:2022 | 03 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,152 | $1,500 | |
TT0278 #01 Y:2022 | 01 | 2022 | Utilize higher efficiency lamps and/or ballasts | $24,020 | $107,478 |