ITAC Assessment: TT0318
ITAC logo
ITAC Assessment: TT0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Bottled Water
NAICS 312112: Bottled Water Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 71
Plant Area 554,040
ft2
Annual Production 1,650,755,184
units
Production Hrs. Annual 8,760
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,217,804 32,002,800
kWh
Electricity Demand $816,582 56,168
kW-mo/yr
Natural Gas $65,264 9,111
MMBtu
Waste Disposal Costs
Water Usage $905,317 249,533
Tgal
Water Disposal $240,422 81,054
Tgal
TOTAL YEARLY COSTS $4,245,389
RECOMMENDED SAVINGS* $591,559 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $519,539 $7,626,292 $519,539
7,496,959
kWh
- - - - -
02 2.4224: Upgrade controls on compressors $25,497 $30,000 $25,497
367,920
kWh
- - - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $17,101 $94 $13,280
191,632
kWh
$3,821
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,027 $65,640 $7,006
101,099
kWh
$2,021
-
kW-mo/yr
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,815 $1,500 $6,071
87,600
kWh
$1,744
-
kW-mo/yr
- - - -
06 2.2441: Preheat boiler makeup water with waste process heat $5,885 $12,180 $792
11,435
kWh
- $5,093
-
MMBtu
- - -
07 3.4114: Replace city water with recycled water via cooling tower $4,912 $15,000 - - - $4,353
-
Tgal
$3,559
-
Tgal
$(-3,000.0)
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,783 $460 $693
10,000
kWh
$1,090
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $591,559 $7,751,166 $572,878
8,266,645
kWh
$8,676
-
kW-mo/yr
$5,093
-
MMBtu
$4,353
-
Tgal
$3,559
-
Tgal
$(-3,000.0)
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs