Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,417

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2403 #08 Y:2024 Install timers and/or thermostats $1,116 $333
UC2403 #06 Y:2024 Utilize controls to operate equipment only when needed $1,576 $50
UC2403 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $5,880 $1,300
UC2403 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $2,934 -
UC2403 #02 Y:2024 Pay utility bills on time $64 -
UC2403 #01 Y:2024 Apply for tax-free status for energy purchases $4,885 -
UC2314 #05 Y:2023 Insulate bare equipment $2,702 $800
MA0852 #08 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,591 $1,544
MA0852 #01 Y:2023 Use solar heat to make electricty $99,365 $854,943
MA0854 #06 Y:2023 Reduce the pressure of compressed air to the minimum required $1,399 $3,125
MA0854 #04 Y:2023 Install occupancy sensors $3,953 $6,018
MA0854 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $6,825 $12,405
MA0853 #06 Y:2023 Use or replace with energy efficient substitutes $3,336 $24,300
MA0853 #05 Y:2023 Use or replace with energy efficient substitutes $3,613 $59,377
MA0853 #03 Y:2023 Use cooling tower or economizer to replace chiller cooling $7,672 $30,500
MA0853 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $12,202 $18,988
MA0851 #07 Y:2023 Avoid frost formation on evaporators $434 $216
MA0851 #06 Y:2023 Use or replace with energy efficient substitutes $1,544 $5,977
MA0851 #03 Y:2023 Apply for tax-free status for energy purchases $28,576 $1,000
MA0851 #01 Y:2023 Use solar heat to make electricty $135,448 $385,041