ITAC Assessment: UC2403
ITAC logo
ITAC Assessment: UC2403
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Security hardware
NAICS 332510: Hardware Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 32
Plant Area 43,000
ft2
Annual Production 3,000,000
units
Production Hrs. Annual 2,500
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,239 573,000
kWh
Electricity Demand $28,083 2,229
kW-mo/yr
Electricity Fees $5,792 -
Natural Gas $26,619 1,888
MMBtu
TOTAL YEARLY COSTS $144,734
RECOMMENDED SAVINGS* $68,827 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $4,885 - - - $4,885 -
02 2.8123: Pay utility bills on time $64 - - - $64 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,934 - $2,626
17,864
kWh
$308
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $2,103 $428 $1,882
12,801
kWh
$221
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,880 $1,300 $5,262
35,795
kWh
$618
-
kW-mo/yr
- -
06 2.6231: Utilize controls to operate equipment only when needed $1,576 $50 $1,576
10,718
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $753 $2,612 $674
4,585
kWh
$79
-
kW-mo/yr
- -
08 2.7261: Install timers and/or thermostats $1,116 $333 - - - $1,116
-
MMBtu
09 2.9114: Use solar heat to make electricty $49,517 $311,208 $49,517
336,847
kWh
- - -
TOTAL RECOMMENDED $68,827 $315,931 $61,536
418,610
kWh
$1,226
-
kW-mo/yr
$4,949 $1,116
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs