ITAC Assessment: IC0214
ITAC logo
ITAC Assessment: IC0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Welded Steel Tubing
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 210,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 4,174
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $387,829 5,019,168
kWh
Electricity Demand $272,474 21,505
kW-mo/yr
Natural Gas $26,702 4,943
MMBtu
TOTAL YEARLY COSTS $687,005
RECOMMENDED SAVINGS* $152,955 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,482

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $23,818 $40,641 - - - $23,818
02 2.2622: Replace existing chiller with high efficiency model $54,479 $37,103 $53,277
591,968
kWh
$1,202
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,278 $18,800 $17,875
198,615
kWh
$403
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $19,255 $68,455 $14,909
165,656
kWh
$4,346
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $32,132 $4,600 $31,422
349,128
kWh
$710
-
kW-mo/yr
- -
06 3.6123: Burn wood by-products for heat $4,994 $7,572 - - $4,994
-
MMBtu
-
TOTAL RECOMMENDED $152,955 $177,171 $117,483
1,305,367
kWh
$6,660
-
kW-mo/yr
$4,994
-
MMBtu
$23,818
TOTAL IMPLEMENTED $93,482 $132,496 $64,206
713,399
kWh
$5,458
-
kW-mo/yr
- $23,818
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs