ITAC Assessment: AS0317
ITAC logo
ITAC Assessment: AS0317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Trusses for prefabricated wooden buildings
NAICS
n/a
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $50
M
to 100
M
# of Employees 340
Plant Area 1,000,000
ft2
Annual Production 14,000
thousand feet
Production Hrs. Annual 4,845
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,156 2,366,160
kWh
Electricity Demand $15,541 6,602
kW-mo/yr
Electricity Fees $13,510 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,358 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,436 $62,000 n/a $15,548
385,530
kWh
$888
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,944 $7,938 n/a $2,887
71,593
kWh
$2,057
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $425 $1,500 n/a $250
6,194
kWh
$175
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,870 $120 n/a $1,870
46,365
kWh
- -
05 2.4133: Use most efficient type of electric motors $1,103 $2,802 n/a $541
13,416
kWh
$562
-
kW-mo/yr
-
06 3.5316: Contract a wood pallet recycling company $1,358 $176 n/a - - $1,358
07 3.5217: Reuse / recycle/ sell paper products $222 $60 n/a - - $222
TOTAL RECOMMENDED $26,358 $74,596 $21,096
523,098
kWh
$3,682
-
kW-mo/yr
$1,580
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs