Assessment Year | 2002 |
---|---|
Principal Product | Trusses for prefabricated wooden buildings |
NAICS |
n/a
|
SIC | 2452: Prefabricated Wood Buildings and Components |
Sales Range | $50 M to 100M |
# of Employees | 340 |
Plant Area |
1,000,000
ft2
|
Annual Production | 14,000
thousand feet
|
Production Hrs. Annual | 4,845
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $134,156 | 2,366,160 |
kWh
|
$0.057 |
Electricity Demand | $15,541 | 6,602 |
kW-mo/yr
|
$2.35 |
Electricity Fees | $13,510 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,358 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,436 | $62,000 | n/a |
$15,548
385,530
kWh
|
$888
-
kW-mo/yr
|
- |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,944 | $7,938 | n/a |
$2,887
71,593
kWh
|
$2,057
-
kW-mo/yr
|
- |
03 | 2.7135: Install occupancy sensors | $425 | $1,500 | n/a |
$250
6,194
kWh
|
$175
-
kW-mo/yr
|
- |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,870 | $120 | n/a |
$1,870
46,365
kWh
|
- | - |
05 | 2.4133: Use most efficient type of electric motors | $1,103 | $2,802 | n/a |
$541
13,416
kWh
|
$562
-
kW-mo/yr
|
- |
06 | 3.5316: Contract a wood pallet recycling company | $1,358 | $176 | n/a | - | - | $1,358 |
07 | 3.5217: Reuse / recycle/ sell paper products | $222 | $60 | n/a | - | - | $222 |
TOTAL RECOMMENDED | $26,358 | $74,596 |
$21,096
523,098
kWh
|
$3,682
-
kW-mo/yr
|
$1,580 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs