ITAC Assessment: MA0854
ITAC logo
ITAC Assessment: MA0854
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Aerospace Sensors
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 61
Plant Area 78,000
ft2
Annual Production 50,000
units
Production Hrs. Annual 3,120
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,045 1,947,840
kWh
Electricity Demand $39,177 4,897
kW-mo/yr
Electricity Fees $(-3,086.0) -
Natural Gas $24,820 1,773
MMBtu
TOTAL YEARLY COSTS $256,956
RECOMMENDED SAVINGS* $24,917 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,177

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,825 $12,405 $5,233
51,816
kWh
$1,592
-
kW-mo/yr
-
02 2.7314: Reduce ventilation air $4,889 $35,240 $583
5,768
kWh
$176
-
kW-mo/yr
$4,130
-
MMBtu
03 2.4322: Use or replace with energy efficient substitutes $4,725 $7,950 $3,621
35,855
kWh
$1,104
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $3,953 $6,018 $3,953
39,137
kWh
- -
05 2.6231: Utilize controls to operate equipment only when needed $3,126 $1,425 $2,398
23,740
kWh
$728
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,399 $3,125 $1,072
10,617
kWh
$327
-
kW-mo/yr
-
TOTAL RECOMMENDED $24,917 $66,163 $16,860
166,933
kWh
$3,927
-
kW-mo/yr
$4,130
-
MMBtu
TOTAL IMPLEMENTED $12,177 $21,548 $10,258
101,570
kWh
$1,919
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs