Assessment Year | 2023 |
---|---|
Principal Product | Polycarbonate lenses |
NAICS | 339115: Ophthalmic Goods Manufacturing |
SIC | 3851: Ophthalmic Goods |
Sales Range | $50 M to 100M |
# of Employees | 393 |
Plant Area |
175,195
ft2
|
Annual Production | 20,000,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,398,500 | 17,384,400 |
kWh
|
$0.14 |
Electricity Demand | $443,110 | 29,196 |
kW-mo/yr
|
$15.18 |
Electricity Fees | $500,339 | - |
|
- |
Natural Gas | $81,940 | 8,104 |
MMBtu
|
$10.11 |
TOTAL YEARLY COSTS | $3,423,889 | |||
RECOMMENDED SAVINGS* | $319,309 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,702 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $5,543 | - | - | - | $5,543 | - | - | - | |
02 | 2.8123: Pay utility bills on time | $3,211 | - | - | - | $3,211 | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $3,655 | $1,283 |
$3,177
23,021
kWh
|
$479
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $5,943 | $21,500 |
$5,165
37,426
kWh
|
$778
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.2511: Insulate bare equipment | $2,702 | $800 |
$2,702
19,580
kWh
|
- | - | - | - | - | |
06 | 2.2136: Install / repair insulation on steam lines | $627 | $1,061 | - | - | - |
$627
-
MMBtu
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $1,082 | $1,674 |
$1,029
7,456
kWh
|
$53
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,033 | - | - | - | - |
$1,513
-
MMBtu
|
$(-480.0) | - | |
09 | 2.3192: Use fossil fuel powered generator during peak demand periods | $14,221 | - |
$1,093
7,920
kWh
|
$4,008
-
kW-mo/yr
|
$9,120 | - | - | - | |
10 | 2.1224: Replace boiler | $8,265 | $39,281 | - | - | - |
$8,265
-
MMBtu
|
- | - | |
11 | 2.9114: Use solar heat to make electricty | $197,753 | $1,537,591 |
$197,753
1,432,994
kWh
|
- | - | - | - | - | |
12 | 2.3141: Use battery storage for demand control | $26,966 | $395,108 |
$(-7,641.3)
(-55,372)
kWh
|
$36,432
-
kW-mo/yr
|
- | - | - | $(-1,824.4) | |
13 | 2.3112: Store heated/ cooled water for use during peak demand periods | $24,735 | $170,000 | - |
$24,735
-
kW-mo/yr
|
- | - | - | - | |
14 | 2.4322: Use or replace with energy efficient substitutes | $6,261 | $34,348 |
$2,949
21,368
kWh
|
$3,312
-
kW-mo/yr
|
- | - | - | - | |
15 | 2.4322: Use or replace with energy efficient substitutes | $17,312 | $39,269 |
$15,044
109,087
kWh
|
$2,268
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $319,309 | $2,241,914 |
$221,270
1,603,479
kWh
|
$72,065
-
kW-mo/yr
|
$17,874 |
$10,405
-
MMBtu
|
$(-480.0) | $(-1,824.4) | ||
TOTAL IMPLEMENTED | $2,702 | $800 |
$2,702
19,580
kWh
|
- | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs