| Assessment Year | 2009 |
|---|---|
| Principal Product | Tie Wraps |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 225 |
| Plant Area |
200,000
ft2
|
| Annual Production | 750,000,000
pieces
|
| Production Hrs. Annual | 6,120
hrs
|
| Location (State) | Puerto Rico |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,188,013 | 11,186,340 |
kWh
|
$0.20 |
| Electricity Demand | $221,331 | 38,469 |
kW-mo/yr
|
$5.75 |
| Electricity Fees | $41,445 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $111,731 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $43,571 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7221: Lower temperature during the winter season and vice-versa | $2,329 | $2,000 |
$29
150
kWh
|
$2,300
-
kW-mo/yr
|
|
| 02 | 2.2136: Install / repair insulation on steam lines | $31,195 | $912 |
$27,059
198,408
kWh
|
$4,136
-
kW-mo/yr
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,542 | $16,140 |
$21,177
155
kWh
|
$2,365
-
kW-mo/yr
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,954 | $1,210 |
$34
174
kWh
|
$1,920
-
kW-mo/yr
|
|
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $15,166 | $40 |
$13,888
71,040
kWh
|
$1,278
-
kW-mo/yr
|
|
| 06 | 2.4323: Use optimum size and capacity equipment | $5,006 | $4,531 |
$4,647
23
kWh
|
$359
-
kW-mo/yr
|
|
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,697 | $1,210 |
$10,170
52,021
kWh
|
$527
-
kW-mo/yr
|
|
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,199 | $40 |
$4,887
24,999
kWh
|
$312
-
kW-mo/yr
|
|
| 09 | 2.4323: Use optimum size and capacity equipment | $8,417 | $4,531 |
$7,982
40
kWh
|
$435
-
kW-mo/yr
|
|
| 10 | 2.6218: Turn off equipment when not in use | $8,226 | $3,320 |
$7,631
39
kWh
|
$595
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $111,731 | $33,934 |
$97,504
347,049
kWh
|
$14,227
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $43,571 | $7,820 |
$36,639
148,423
kWh
|
$6,932
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs