Assessment Year | 2023 |
---|---|
Principal Product | Waste water treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $50 M to 100M |
# of Employees | 20 |
Plant Area |
1,500,000
ft2
|
Annual Production | 10,950,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,179,109 | 17,214,525 |
kWh
|
$0.13 |
Electricity Demand | $212,467 | 27,280 |
kW-mo/yr
|
$7.79 |
Electricity Fees | $(-7,739.0) | - |
|
- |
Natural Gas | $609,360 | 98,546 |
MMBtu
|
$6.18 |
Other Energy | $24,598 | 826 |
MMBtu
|
$29.78 |
TOTAL YEARLY COSTS | $3,017,795 | |||
RECOMMENDED SAVINGS* | $197,961 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $100,956 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $99,365 | $854,943 |
$45,203
355,933
kWh
|
$13,813
-
kW-mo/yr
|
- | - | $40,349 | |
02 | 2.6218: Turn off equipment when not in use | $35,986 | $16,136 |
$33,198
261,398
kWh
|
$2,788
-
kW-mo/yr
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $22,824 | $33,749 |
$(-8,900.0)
(-70,080)
kWh
|
$(-748.0)
-
kW-mo/yr
|
$32,472
-
MMBtu
|
- | - | |
04 | 2.3322: Use existing dam to generate electricity | $20,149 | $203,280 |
$27,813
219,000
kWh
|
$2,336
-
kW-mo/yr
|
- | - | $(-10,000.0) | |
05 | 2.8226: Increase efficiency of trucks | $10,205 | $546,530 |
$(-10,298.0)
(-81,087)
kWh
|
- | - |
$20,503
-
MMBtu
|
- | |
06 | 2.6218: Turn off equipment when not in use | $5,244 | $1,866 |
$4,839
38,106
kWh
|
$405
-
kW-mo/yr
|
- | - | - | |
07 | 2.7224: Reduce space conditioning during non-working hours | $2,597 | $875 |
$482
3,796
kWh
|
- |
$2,115
-
MMBtu
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,591 | $1,544 |
$1,467
11,549
kWh
|
$124
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $197,961 | $1,658,923 |
$93,804
738,615
kWh
|
$18,718
-
kW-mo/yr
|
$34,587
-
MMBtu
|
$20,503
-
MMBtu
|
$30,349 | ||
TOTAL IMPLEMENTED | $100,956 | $856,487 |
$46,670
367,482
kWh
|
$13,937
-
kW-mo/yr
|
- | - | $40,349 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs