Assessment Year | 2024 |
---|---|
Principal Product | sheet metal |
NAICS | 332322: Sheet Metal Work Manufacturing |
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
75,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 5,330
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $141,889 | 1,509,224 |
kWh
|
$0.094 | |
Electricity Demand | $33,857 | 3,846 |
kW-mo/yr
|
$8.80 | |
Electricity Fees | $3,878 | - |
|
- | |
Natural Gas | $54,171 | 15,599 |
MMBtu
|
$3.47 | |
Waste Disposal Costs | |||||
Water Usage | $26,133 | 1,126 |
Tgal
|
$23.21 | |
TOTAL YEARLY COSTS | $259,929 | ||||
RECOMMENDED SAVINGS* | $27,942 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,921 | $5,609 |
$4,064
43,238
kWh
|
$857
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,929 | $5,415 |
$5,723
60,883
kWh
|
$1,206
-
kW-mo/yr
|
- | |
03 | 2.3212: Optimize plant power factor | $4,810 | $1,986 | - |
$4,810
-
kW-mo/yr
|
- | |
04 | 4.812: Apply for investment incentives | $5,847 | - | - | - | $5,847 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,083 | $5,482 |
$3,908
41,579
kWh
|
$1,174
-
kW-mo/yr
|
- | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $351 | $180 |
$351
3,739
kWh
|
- | - | |
TOTAL RECOMMENDED | $27,942 | $18,672 |
$14,047
149,439
kWh
|
$8,047
-
kW-mo/yr
|
$5,847 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs