ITAC Assessment: UC2410
ITAC logo
ITAC Assessment: UC2410
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Carbon-based filters
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 45,000
ft2
Annual Production 36,000
units
Production Hrs. Annual 4,500
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,693 1,195,600
kWh
Electricity Demand $46,701 3,451
kW-mo/yr
Electricity Fees $3,479 -
Natural Gas $998 71
MMBtu
TOTAL YEARLY COSTS $249,871
RECOMMENDED SAVINGS* $11,007 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.8121: Apply for tax-free status for energy purchases $1,516 - - - $1,516
02 2.8123: Pay utility bills on time $187 - - - $187
03 2.8114: Change rate schedules or other changes in utility service $238 - - - $238
04 2.6231: Utilize controls to operate equipment only when needed $3,168 $100 $3,168
18,945
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,615 $75 $2,353
14,155
kWh
$262
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,308 $1,300 $1,177
7,080
kWh
$131
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,791 $3,455 $1,611
9,693
kWh
$180
-
kW-mo/yr
-
08 2.7221: Lower temperature during the winter season and vice-versa $185 - $185
1,111
kWh
- -
TOTAL RECOMMENDED $11,007 $4,930 $8,493
50,985
kWh
$573
-
kW-mo/yr
$1,941
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs