Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,116

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0286 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $25,164 $3,000
UA0286 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $35,619 $21,591
UA0285 #05 Y:2024 Utilize energy-efficient belts and other improved mechanisms $757 $411
UA0285 #04 Y:2024 Install occupancy sensors $159 $301
UA0284 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $479 $500
UA0284 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,762 $8,114
UA0284 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $8,690 $13,427
UA0283 #10 Y:2023 Use synthetic lubricant $6,907 $21,930
UA0283 #09 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $5,911 $8,591
UA0283 #08 Y:2023 Reduce the pressure of compressed air to the minimum required $8,686 $750
UA0283 #05 Y:2023 Pay bills on time to avoid late fees $21,298 -
UA0283 #04 Y:2023 Reduce illumination to minimum necessary levels $4,087 -
UA0283 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $24,247 $22,655
UA0282 #06 Y:2023 Reduce the pressure of compressed air to the minimum required $95 $250
UA0282 #05 Y:2023 Install occupancy sensors $1,227 $1,174
UA0282 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $927 $1,176
UA0282 #03 Y:2023 Install timers and/or thermostats $1,197 $297
UA0281 #05 Y:2023 Utilize higher efficiency lamps and/or ballasts $56,035 $68,083
UA0281 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $8,484 $8,591
UA0281 #03 Y:2023 Reduce the pressure of compressed air to the minimum required $4,375 $1,000