Assessment Year | 2024 |
---|---|
Principal Product | Valves, Fittings |
NAICS | 332913: Plumbing Fixture Fitting and Trim Manufacturing |
SIC | 3432: Plumbing Fixture Fittings and Trim |
Sales Range | $100 M to 500M |
# of Employees | 568 |
Plant Area |
1,061,203
ft2
|
Annual Production | 120,513,270
units
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,631,851 | 20,334,300 |
kWh
|
$0.080 | |
Electricity Demand | $493,982 | 42,691 |
kW-mo/yr
|
$11.57 | |
Electricity Fees | $170,361 | - |
|
- | |
Natural Gas | $198,040 | 22,039 |
MMBtu
|
$8.99 | |
Waste Disposal Costs | |||||
Water Usage | $76,497 | 5,998 |
Tgal
|
$12.75 | |
Water Disposal | $64,901 | 5,998 |
Tgal
|
$10.82 | |
TOTAL YEARLY COSTS | $2,635,632 | ||||
RECOMMENDED SAVINGS* | $524,036 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $416,153 | $3,377,796 |
$349,887
4,357,254
kWh
|
$35,404
-
kW-mo/yr
|
$30,862 | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,247 | $22,655 |
$17,786
221,496
kWh
|
$4,663
-
kW-mo/yr
|
$1,798 | - | - | |
03 | 2.7135: Install occupancy sensors | $4,924 | $754 |
$4,559
56,771
kWh
|
- | $365 | - | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $4,087 | - |
$2,997
37,319
kWh
|
$787
-
kW-mo/yr
|
$303 | - | - | |
05 | 4.821: Pay bills on time to avoid late fees | $21,298 | - | - | - | $21,298 | - | - | |
06 | 3.4116: Meter recycled water (to reduce sewer charges) | $12,662 | $6,036 | - | - | - | - |
$12,662
-
Tgal
|
|
07 | 2.7261: Install timers and/or thermostats | $14,473 | $2,726 |
$13,400
166,872
kWh
|
- | $1,073 | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,686 | $750 |
$4,872
60,671
kWh
|
$3,170
-
kW-mo/yr
|
$644 | - | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,911 | $8,591 |
$5,431
67,638
kWh
|
$42
-
kW-mo/yr
|
$438 | - | - | |
10 | 2.4314: Use synthetic lubricant | $6,907 | $21,930 |
$5,068
63,109
kWh
|
$1,327
-
kW-mo/yr
|
$512 | - | - | |
11 | 2.2414: Use waste heat from hot flue gases to preheat | $4,688 | $31,108 | - | - | - |
$4,688
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $524,036 | $3,472,346 |
$404,000
5,031,130
kWh
|
$45,393
-
kW-mo/yr
|
$57,293 |
$4,688
-
MMBtu
|
$12,662
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs