Assessment Year 1995
Principal Product Door Mats, Temporary Erosion Control Devices
NAICS
n/a
SIC 2842: Specialty Cleaning, Polishing, and Sanitation Preparations
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 63,870
ft2
Annual Production 14,000
thousand feet
Production Hrs. Annual 5,880
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,806 2,699,297
kWh
Natural Gas $8,688 2,256
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,597 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,542

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $30,651 $13,770 $37,881
688,159
kWh
$(-7,230.0)
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,421 $6,872 $2,421
38,980
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,120 $232 $1,120
18,171
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $468 - $468
7,913
kWh
-
05 2.4133: Use most efficient type of electric motors $1,161 $3,223 $1,161
18,757
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $156 - $156
2,638
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $1,713 $838 $1,713
27,257
kWh
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $284 $276 $284
2,931
kWh
-
09 3.1191: Change procedures / equipment / operating conditions $5,623 $16,000 $5,623
44,256
kWh
-
TOTAL RECOMMENDED $43,597 $41,211 $50,827
849,062
kWh
$(-7,230.0)
-
MMBtu
TOTAL IMPLEMENTED $11,542 $26,933 $11,542
139,801
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs