ITAC Assessment: UA0281
ITAC logo
ITAC Assessment: UA0281
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Aircraft Composites
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 610
Plant Area 380,000
ft2
Annual Production 2,600
units
Production Hrs. Annual 7,344
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,569,804 33,399,980
kWh
Electricity Demand $334,709 73,210
kW-mo/yr
Electricity Fees $31,895 -
Natural Gas $197,542 22,343
MMBtu
Waste Disposal Costs
Water Usage $53,091 17,858
Tgal
Water Disposal $27,423 17,858
Tgal
TOTAL YEARLY COSTS $3,214,464
RECOMMENDED SAVINGS* $180,210 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.3212: Optimize plant power factor $18,036 $12,615 - $17,840
-
kW-mo/yr
$196 - -
02 3.4116: Meter recycled water (to reduce sewer charges) $14,808 $5,698 - - - - $14,808
-
Tgal
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,375 $1,000 $3,440
44,739
kWh
$887
-
kW-mo/yr
$48 - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,484 $8,591 $7,553
98,217
kWh
$839
-
kW-mo/yr
$92 - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $56,035 $68,083 $50,519
656,943
kWh
$4,906
-
kW-mo/yr
$610 - -
06 2.7135: Install occupancy sensors $6,060 $1,885 $5,994
77,940
kWh
- $66 - -
07 2.1113: Reduce combustion air flow to optimum $5,437 $26,750 - - - $5,437
-
MMBtu
-
08 2.2414: Use waste heat from hot flue gases to preheat $21,490 $49,464 - - - $21,490
-
MMBtu
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $40,483 $47,040 $37,028
481,514
kWh
$3,015
-
kW-mo/yr
$440 - -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,002 $15,154 $3,736
48,584
kWh
$1,212
-
kW-mo/yr
$54 - -
TOTAL RECOMMENDED $180,210 $236,280 $108,270
1,407,937
kWh
$28,699
-
kW-mo/yr
$1,506 $26,927
-
MMBtu
$14,808
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs