| Assessment Year | 2024 |
|---|---|
| Principal Product | Formaldehyde |
| NAICS | 325211: Plastics Material and Resin Manufacturing |
| SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
| Sales Range | $10 M to 50M |
| # of Employees | 26 |
| Plant Area |
360,000
ft2
|
| Annual Production | 74,500
ton
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $365,658 | 8,952,000 |
kWh
|
$0.041 | |
| Electricity Demand | $283,819 | 12,265 |
kW-mo/yr
|
$23.14 | |
| Electricity Fees | $95,126 | - |
|
- | |
| Natural Gas | $39,677 | 2,387 |
MMBtu
|
$16.62 | |
| Waste Disposal Costs | |||||
| Water Usage | $37,320 | 23,549 |
Tgal
|
$1.58 | |
| TOTAL YEARLY COSTS | $821,600 | ||||
| RECOMMENDED SAVINGS* | $140,101 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $916 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $117,423 | $1,498,840 |
$82,704
2,027,074
kWh
|
$19,715
-
kW-mo/yr
|
$15,004 | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $682 | $250 |
$595
14,584
kWh
|
- | $87 | |
| 03 | 2.7261: Install timers and/or thermostats | $461 | $116 |
$402
9,851
kWh
|
- | $59 | |
| 04 | 2.7135: Install occupancy sensors | $159 | $301 |
$139
3,397
kWh
|
- | $20 | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $757 | $411 |
$35
846
kWh
|
$625
-
kW-mo/yr
|
$97 | |
| 06 | 2.3212: Optimize plant power factor | $20,619 | $5,049 | - | - | $20,619 | |
| TOTAL RECOMMENDED | $140,101 | $1,504,967 |
$83,875
2,055,752
kWh
|
$20,340
-
kW-mo/yr
|
$35,886 | ||
| TOTAL IMPLEMENTED | $916 | $712 |
$174
4,243
kWh
|
$625
-
kW-mo/yr
|
$117 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs