ITAC Assessment: MA0702
ITAC logo
ITAC Assessment: MA0702
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Wooden reels
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 62,000
ft2
Annual Production 3,200,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,323 2,021,144
kWh
Electricity Demand $81,757 5,167
kW-mo/yr
Electricity Fees $5,072 -
LPG $99,204 4,232
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,489 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,387

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.5123: Reduce fluid flow rates $11,375 $9,400 $11,375
138,724
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,144 $1,500 $2,144
26,141
kWh
-
03 2.2136: Install / repair insulation on steam lines $1,102 $2,210 - $1,102
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $868 $3,000 $868
10,579
kWh
-
TOTAL RECOMMENDED $15,489 $16,110 $14,387
175,444
kWh
$1,102
-
MMBtu
TOTAL IMPLEMENTED $14,387 $13,900 $14,387
175,444
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs