Assessment Year | 2019 |
---|---|
Principal Product | Electron tubes |
NAICS | 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur |
SIC | 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments |
Sales Range | $50 M to 100M |
# of Employees | 450 |
Plant Area |
116,000
ft2
|
Annual Production | 75,000
units
|
Production Hrs. Annual | 8,544
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $890,509 | 15,418,116 |
kWh
|
$0.058 |
Electricity Demand | $188,529 | 24,552 |
kW-mo/yr
|
$7.68 |
Electricity Fees | $14,963 | - |
|
- |
TOTAL YEARLY COSTS | $1,094,001 | |||
RECOMMENDED SAVINGS* | $809,181 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $90,236 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 4.212: Adopt in-house material generation | $718,945 | $688,982 |
$(-95,607.0)
(-1,593,456)
kWh
|
$(-17,188.0)
-
kW-mo/yr
|
$831,740 | |
02 | 2.2622: Replace existing chiller with high efficiency model | $64,747 | $120,000 |
$54,329
905,487
kWh
|
$10,418
-
kW-mo/yr
|
- | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $17,100 | $7,907 |
$14,494
241,582
kWh
|
$2,606
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,264 | $3,590 |
$6,158
102,630
kWh
|
$1,106
-
kW-mo/yr
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $1,125 | $1,213 |
$1,003
16,716
kWh
|
$122
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $809,181 | $821,692 |
$(-19,623.0)
(-327,041)
kWh
|
$(-2,936.0)
-
kW-mo/yr
|
$831,740 | ||
TOTAL IMPLEMENTED | $90,236 | $132,710 |
$75,984
1,266,415
kWh
|
$14,252
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs