Assessment Year | 2021 |
---|---|
Principal Product | Beer |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
43,000
ft2
|
Annual Production | 48,876
bbl
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $158,173 | 1,517,680 |
kWh
|
$0.10 |
Natural Gas | $30,934 | 7,579 |
MMBtu
|
$4.08 |
TOTAL YEARLY COSTS | $189,107 | |||
RECOMMENDED SAVINGS* | $63,831 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $63,831 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,717 | $1,850 |
$16,617
159,782
kWh
|
- | - | $(-2,900.0) | |
02 | 2.8121: Apply for tax-free status for energy purchases | $2,292 | $800 | - | $2,292 | - | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $1,025 | $400 |
$1,025
9,856
kWh
|
- | - | - | |
04 | 2.7261: Install timers and/or thermostats | $229 | $113 |
$229
2,198
kWh
|
- | - | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $8,558 | $8,050 |
$8,558
82,289
kWh
|
- | - | - | |
06 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $38,010 | $172,500 |
$44,200
425,000
kWh
|
- |
$(-6,189.6)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $63,831 | $183,713 |
$70,629
679,125
kWh
|
$2,292 |
$(-6,189.6)
-
MMBtu
|
$(-2,900.0) | ||
TOTAL IMPLEMENTED | $63,831 | $183,713 |
$70,629
679,125
kWh
|
$2,292 |
$(-6,189.6)
-
MMBtu
|
$(-2,900.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs