Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 43,000
ft2
Annual Production 48,876
bbl
Production Hrs. Annual 4,250
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,173 1,517,680
kWh
Natural Gas $30,934 7,579
MMBtu
TOTAL YEARLY COSTS $189,107
RECOMMENDED SAVINGS* $63,831 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,831

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,717 $1,850 $16,617
159,782
kWh
- - $(-2,900.0)
02 2.8121: Apply for tax-free status for energy purchases $2,292 $800 - $2,292 - -
03 2.4239: Eliminate or reduce compressed air usage $1,025 $400 $1,025
9,856
kWh
- - -
04 2.7261: Install timers and/or thermostats $229 $113 $229
2,198
kWh
- - -
05 2.4239: Eliminate or reduce compressed air usage $8,558 $8,050 $8,558
82,289
kWh
- - -
06 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $38,010 $172,500 $44,200
425,000
kWh
- $(-6,189.6)
-
MMBtu
-
TOTAL RECOMMENDED $63,831 $183,713 $70,629
679,125
kWh
$2,292 $(-6,189.6)
-
MMBtu
$(-2,900.0)
TOTAL IMPLEMENTED $63,831 $183,713 $70,629
679,125
kWh
$2,292 $(-6,189.6)
-
MMBtu
$(-2,900.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs