ITAC Assessment: UA0286
ITAC logo
ITAC Assessment: UA0286
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Cast Automotive Parts
NAICS 331511: Iron Foundries
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 132,567
ft2
Annual Production 9,632,828
lb
Production Hrs. Annual 7,200
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $5,407,046 60,586,804
kWh
Electricity Fees $(-122,444.0) -
Natural Gas $112,715 16,440
MMBtu
TOTAL YEARLY COSTS $5,397,317
RECOMMENDED SAVINGS* $70,878 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $35,619 $21,591 $36,443
408,559
kWh
$(-824.0)
02 2.4231: Reduce the pressure of compressed air to the minimum required $25,164 $3,000 $25,746
288,628
kWh
$(-582.0)
03 2.7261: Install timers and/or thermostats $5,869 $616 $6,005
67,321
kWh
$(-136.0)
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,777 $1,950 $3,864
43,320
kWh
$(-87.0)
05 2.7135: Install occupancy sensors $449 $1,292 $459
5,152
kWh
$(-10.0)
TOTAL RECOMMENDED $70,878 $28,449 $72,517
812,980
kWh
$(-1,639.0)
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs