*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area 26,000
ft2
Annual Production 7,000
bbl
Production Hrs. Annual 3,276
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,204 470,079
kWh
Natural Gas $18,262 1,116
MMBtu
Waste Disposal Costs
Water Usage $6,195 1,606
Tgal
Gaseous Waste $23,119 6,612
lb
TOTAL YEARLY COSTS $130,780
RECOMMENDED SAVINGS* $10,410 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,446

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings
01 2.2113: Repair or replace steam traps $3,672 $165 - $3,595
-
MMBtu
$77
-
Tgal
02 2.1241: Reduce excessive boiler blowdown $3,292 $5,675 - $2,896
-
MMBtu
$396
-
Tgal
03 2.7261: Install timers and/or thermostats $1,197 $297 $1,197
6,736
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $927 $1,176 $927
5,233
kWh
- -
05 2.7135: Install occupancy sensors $1,227 $1,174 $1,227
6,925
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $95 $250 $95
538
kWh
- -
TOTAL RECOMMENDED $10,410 $8,737 $3,446
19,432
kWh
$6,491
-
MMBtu
$473
-
Tgal
TOTAL IMPLEMENTED $3,446 $2,897 $3,446
19,432
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs