ITAC Assessment: HO0110
ITAC logo
ITAC Assessment: HO0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Gears
NAICS
n/a
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 55,000
ft2
Annual Production 84,000
lb
Production Hrs. Annual 4,264
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,396 1,216,589
kWh
Fuel Oil #2 $18,294 2,989
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,834 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,845 $6,502 $12,845
87,339
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,841 $4,231 $3,841
26,084
kWh
-
03 2.4133: Use most efficient type of electric motors $342 $450 $342
2,345
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $964 $400 $964
6,448
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $842 $1,500 $1,024
7,034
kWh
$(-182.0)
-
MMBtu
TOTAL RECOMMENDED $18,834 $13,083 $19,016
129,250
kWh
$(-182.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs