Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,112

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0683 #01 Y:2016 Reduce combustion air flow to optimum $19,831 $19,940
OR0675 #04 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $3,199 $7,215
OR0675 #03 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $22,809 $23,810
OR0675 #02 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $31,062 $1,969
OR0675 #01 Y:2016 Install equipment to move product $79,123 $89,654
OR0674 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $3,953 -
OR0674 #02 Y:2016 Use waste heat from hot flue gases to preheat $5,376 $4,258
OR0674 #01 Y:2016 Reduce the pressure of compressed air to the minimum required $5,868 -
OR0673 #05 Y:2016 Utilize energy-efficient belts and other improved mechanisms $1,464 -
OR0673 #04 Y:2016 Utilize higher efficiency lamps and/or ballasts $2,117 $5,344
OR0673 #03 Y:2016 Insulate bare equipment $4,333 $229
OR0673 #02 Y:2016 Use waste heat from hot flue gases to preheat $102,571 $10,390
OR0673 #01 Y:2016 Replace existing equipment with more suitable substitutes $157,793 $301,613
OR0661 #05 Y:2015 Reduce the pressure of compressed air to the minimum required $1,783 $2,340
OR0661 #04 Y:2015 Install vinyl strip / high speed / air curtain doors $10,575 $3,600
OR0661 #03 Y:2015 Insulate bare equipment $1,989 $170
OR0661 #02 Y:2015 Replace existing chiller with high efficiency model $76,637 $205,256
OR0661 #01 Y:2015 Replace hydraulic / pneumatic equipment with electric equipment $52,251 $18,807
OR0660 #04 Y:2015 Use solar heat to make electricty $8,242 $54,525
OR0660 #03 Y:2015 Reduce the pressure of compressed air to the minimum required $1,283 $1,500