ITAC Assessment: OR0683
ITAC logo
ITAC Assessment: OR0683
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Aluminum Extrusions
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 143,000
ft2
Annual Production 26,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $336,057 6,616,050
kWh
Electricity Demand $91,933 15,477
kW-mo/yr
Electricity Fees $28,741 -
Natural Gas $93,553 17,248
MMBtu
TOTAL YEARLY COSTS $550,284
RECOMMENDED SAVINGS* $61,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,938

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1113: Reduce combustion air flow to optimum $19,831 $19,940 - - $19,831
-
MMBtu
- -
02 2.4224: Upgrade controls on compressors $16,054 $2,000 $16,054
345,627
kWh
- - - -
03 2.1113: Reduce combustion air flow to optimum $4,107 $670 - - $4,107
-
MMBtu
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,828 $17,274 $7,828
168,527
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,688 $32,940 $9,548
205,546
kWh
$2,348
-
kW-mo/yr
- $266 $(-2,474.0)
06 2.4226: Use / purchase optimum sized compressor $2,456 $10,125 $2,079
44,768
kWh
$376
-
kW-mo/yr
- - -
07 2.1113: Reduce combustion air flow to optimum $1,866 $5,700 - - $1,866
-
MMBtu
- -
TOTAL RECOMMENDED $61,830 $88,649 $35,509
764,468
kWh
$2,724
-
kW-mo/yr
$25,804
-
MMBtu
$266 $(-2,474.0)
TOTAL IMPLEMENTED $23,938 $20,610 - - $23,938
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings