ITAC Assessment: AM0565
ITAC logo
ITAC Assessment: AM0565
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Pork rinds and wheat based snack products
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 50,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 3,312
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,977 1,140,660
kWh
Electricity Demand $14,067 2,495
kW-mo/yr
Electricity Fees $7,755 -
Natural Gas $104,325 10,678
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,044 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,934

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,800 $14,966 $4,180
61,900
kWh
$1,240
-
kW-mo/yr
- $380
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,160 $18 $1,700
25,110
kWh
$460
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,070 $350 $810
12,000
kWh
$260
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $766 $381 $160
2,400
kWh
$16
-
kW-mo/yr
$590 -
05 2.7135: Install occupancy sensors $138 $100 $105
1,570
kWh
$33
-
kW-mo/yr
- -
06 2.4133: Use most efficient type of electric motors $110 $488 $85
1,242
kWh
$25
-
kW-mo/yr
- -
TOTAL RECOMMENDED $10,044 $16,303 $7,040
104,222
kWh
$2,034
-
kW-mo/yr
$590 $380
TOTAL IMPLEMENTED $9,934 $15,815 $6,955
102,980
kWh
$2,009
-
kW-mo/yr
$590 $380
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs