ITAC Assessment: DS0054
ITAC logo
ITAC Assessment: DS0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product After Market Cabs & Roll Over Bars
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 113
Plant Area 88,076
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 6,500
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,635 1,549,531
kWh
Electricity Demand $36,033 7,716
kW-mo/yr
Electricity Fees $1,209 -
Natural Gas $33,317 13,194
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,903 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,131

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Primary Raw Material Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,316 $11,936 $1,935
98,183
kWh
$1,381
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $949 $2,852 $417
21,102
kWh
$532
-
kW-mo/yr
- - -
03 2.4322: Use or replace with energy efficient substitutes $1,415 $3,500 $460
23,447
kWh
$955
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,866 $240 $1,866
94,959
kWh
- - - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $1,755 $4,750 - - - - $1,755
06 3.2121: Convert to electrostatic powder coating $39,602 $6,000 - - $2,082
-
gal
$37,520 -
07 3.1192: Reduce scrap production $27,000 $15,600 - - - $27,000 -
TOTAL RECOMMENDED $75,903 $44,878 $4,678
237,691
kWh
$2,868
-
kW-mo/yr
$2,082
-
gal
$64,520 $1,755
TOTAL IMPLEMENTED $33,131 $30,628 $4,218
214,244
kWh
$1,913
-
kW-mo/yr
- $27,000 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Primary Raw Material Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs