Assessment Year | 2005 |
---|---|
Principal Product | xray accessories |
NAICS | 334517: Irradiation Apparatus Manufacturing |
SIC | 3844: X-Ray Apparatus and Tubes and Related Irradiation Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
155,000
ft2
|
Annual Production | 1,600
pieces
|
Production Hrs. Annual | 4,750
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $140,618 | 2,232,960 |
kWh
|
$0.063 |
Electricity Demand | $28,421 | 9,022 |
kW-mo/yr
|
$3.15 |
Electricity Fees | $3,922 | - |
|
- |
Natural Gas | $85,372 | 9,314 |
MMBtu
|
$9.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,766 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,850 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7141: Lower light fixtures in high ceiling areas | $16,230 | $33,000 |
$13,400
194,000
kWh
|
$2,830
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,600 | $500 |
$2,150
31,200
kWh
|
$450
-
kW-mo/yr
|
- | - | |
03 | 2.3212: Optimize plant power factor | $6,550 | $17,100 | - |
$6,550
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,320 | $300 |
$285
4,170
kWh
|
$35
-
kW-mo/yr
|
$300 | $700 | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $930 | $27 |
$770
11,200
kWh
|
$160
-
kW-mo/yr
|
- | - | |
06 | 3.7132: Reuse rags until completely soiled | $880 | - | - | - | - | $880 | |
07 | 2.4314: Use synthetic lubricant | $256 | - |
$211
3,060
kWh
|
$45
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $28,766 | $50,927 |
$16,816
243,630
kWh
|
$10,070
-
kW-mo/yr
|
$300 | $1,580 | ||
TOTAL IMPLEMENTED | $4,850 | $827 |
$3,205
46,570
kWh
|
$645
-
kW-mo/yr
|
$300 | $700 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs